Utica MGB100 Instructions d'exploitation

Naviguer en ligne ou télécharger Instructions d'exploitation pour Foyers Utica MGB100. Utica MGB100 Operating instructions Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 28
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
INSTINST
INSTINST
INST
ALLAALLA
ALLAALLA
ALLA
TION MANUTION MANU
TION MANUTION MANU
TION MANU
AL AL
AL AL
AL
AND OPERAAND OPERA
AND OPERAAND OPERA
AND OPERA
TING INSTRTING INSTR
TING INSTRTING INSTR
TING INSTR
UCTIONSUCTIONS
UCTIONSUCTIONS
UCTIONS
MGBMGB
MGBMGB
MGB
GAS FIRED BOILERS
FOR FORCED HOT WATER
Utica Boilers, P.O. Box 4729 Utica, NY 13504
Vue de la page 0
1 2 3 4 5 6 ... 27 28

Résumé du contenu

Page 1 - FOR FORCED HOT WATER

INSTINSTINSTINSTINSTALLAALLAALLAALLAALLATION MANUTION MANUTION MANUTION MANUTION MANUAL AL AL AL AL AND OPERAAND OPERAAND OPERAAND OPERAAND OPERATING

Page 2 - Pressure

PAGE 9VENT INSTVENT INSTVENT INSTVENT INSTVENT INSTALLAALLAALLAALLAALLATIONTIONTIONTIONTIONWARNING:WARNING:WARNING:WARNING:WARNING: This boiler shall

Page 3

VENT SYVENT SYVENT SYVENT SYVENT SYSTEM MODIFICASTEM MODIFICASTEM MODIFICASTEM MODIFICASTEM MODIFICATIONTIONTIONTIONTIONWhen an existing boiler is rem

Page 4

VENT DVENT DVENT DVENT DVENT DAMPER INSTAMPER INSTAMPER INSTAMPER INSTAMPER INSTALLAALLAALLAALLAALLATION TION TION TION TION AND INSTRAND INSTRAND INS

Page 5

CONNECTING GAS SERVICECONNECTING GAS SERVICECONNECTING GAS SERVICECONNECTING GAS SERVICECONNECTING GAS SERVICE1. Connect gas service from meter to con

Page 6 - FIGURE 1

LIGHTING INSTRUCTIONSLIGHTING INSTRUCTIONSLIGHTING INSTRUCTIONSLIGHTING INSTRUCTIONSLIGHTING INSTRUCTIONSWARNING:WARNING:WARNING:WARNING:WARNING: IF Y

Page 7 - FIGURE 3 FIGURE 4

FIGURE 14PAGE 14LIGHTING PROCEDURE FOR BOILER WITHLIGHTING PROCEDURE FOR BOILER WITHLIGHTING PROCEDURE FOR BOILER WITHLIGHTING PROCEDURE FOR BOILER WI

Page 8 - FIGURE 5

LIGHTING PROCEDURE FOR BOILERLIGHTING PROCEDURE FOR BOILERLIGHTING PROCEDURE FOR BOILERLIGHTING PROCEDURE FOR BOILERLIGHTING PROCEDURE FOR BOILERWITH

Page 9 - FIGURE 8

9. Push in gas control knob or reset button if so equipped, all the way in and hold.Immediately light the pilot with a match. Continue to hold the gas

Page 10 - FIGURE 10

GENERAL INSTRUCTIONSGENERAL INSTRUCTIONSGENERAL INSTRUCTIONSGENERAL INSTRUCTIONSGENERAL INSTRUCTIONSBefore seasonal start-up, have a competent service

Page 11

FIGURE 19FIGURE 20PAGE 18the mirror positioned above the burners, the flue gas passageways can be checked for sootor scale.The following procedure sho

Page 12 - FIGURE 12

TTTTTABLE OF CONTENTSABLE OF CONTENTSABLE OF CONTENTSABLE OF CONTENTSABLE OF CONTENTSSafety Symbols & Warnings ...

Page 13 - CONNECTING GAS SERVICE

The burners and pilot should be checked for signs of corrosion, rust or scale buildup.The area around the boiler must be kept clear and free of combus

Page 14

PAGE 20CHECK SAFETY CONTROL CIRCUIT, after burner adjustments are made, for satisfactoryoperation.1. Pilot: With main burner operating, turn the pilo

Page 15 - FIGURE 14

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTS - PILTS - PILTS -

Page 16 - FIGURE 16

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTS - BTS - BTS - BTS

Page 17

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTS - JTS - JTS - JTS

Page 18 - FIGURE 17 FIGURE 18

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTSTSTSTSTSHEAHEAHEAH

Page 19 - FIGURE 20

MGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLAMGB SERIES REPLACEMENT PCEMENT PCEMENT PCEMENT PCEMENT PARARARARARTSTSTSTSTSPIPING &am

Page 20 - FIGURE 21

§ § § **†∆∆∆∆∆ Natural PropaneBoiler A.G.A. Heating I=B=R NetRating No. Recommended Gas Orifice WaterNo. Input Capacity NetOutput Sq. Ft. HW of Air Cu

Page 21 - FIGURE 23

*Pump sizeBoiler Natural Dimensions Supply &No. Gas ReturnInlet A B C D E F TappingsMGB 50 1/2" 11.1/8" 5.1/2" 4" 30.3/4"

Page 22 - FIGURE 24

IMPORIMPORIMPORIMPORIMPORTTTTTANT!ANT!ANT!ANT!ANT! READ ALL INSTRUCTIONS BEFORE INSTALLING.WARNING:WARNING:WARNING:WARNING:WARNING:1. Keep boiler area

Page 23 - FIGURE 26

INSTINSTINSTINSTINSTALLAALLAALLAALLAALLATION PRTION PRTION PRTION PRTION PROCEDUREOCEDUREOCEDUREOCEDUREOCEDUREWARNING: Improper installation, adjustme

Page 24 - FIGURE 27

PAGE 4COMBCOMBCOMBCOMBCOMBUSTION USTION USTION USTION USTION AIR REQAIR REQAIR REQAIR REQAIR REQUIREMENTSUIREMENTSUIREMENTSUIREMENTSUIREMENTS(MINIMUM

Page 25 - FIGURE 28

PAGE 5construction, air for combustion and ventilation must be obtained from outdoors or fromspaces freely communicating with the outdoors. A permanen

Page 26 - FIGURE 29

FIGURE 3 FIGURE 4shall be permitted where the equipment has clearances of at least 1 inch from the sides, 1inch from the back, and 6 inches from the f

Page 27

PAGE 7FIGURE 7FIGURE 6BYPASS PIPINGMIXING VALVE PIPING3. Hot water boilers installed above radiation level must be provided with a low water cut-off d

Page 28 - PAGE 27 REV 14.1, May 2004

PAGE 87. Installation using circulators is shown in figure 9 below.8. Installation using zone valves is shown in figure 10 on page 9.9. For further pi

Commentaires sur ces manuels

Pas de commentaire